Software Moves Fast. Can the Systems Beneath It Keep Up?

Recent outages expose a procurement problem: advanced digital services can depend on infrastructure, interfaces, and recovery arrangements that buyers have not adequately examined. The...

  • Khaled KoubaaKhaled Koubaa
  • date icon

    Wednesday, Nov 18, 2026

Software Moves Fast. Can the Systems Beneath It Keep Up?

Recent outages expose a procurement problem: advanced digital services can depend on infrastructure, interfaces, and recovery arrangements that buyers have not adequately examined. The priority is to establish whether an entire business service can withstand change and failure.

The strongest lesson from recent technology outages is that organizations need to assess the resilience of the complete service they are buying. Hardware age matters, but failures can also emerge when software changes, network configurations, shared dependencies, and recovery procedures interact. A sophisticated application cannot compensate for every weakness beneath it.

For chief information officers, enterprise procurement leaders, and operational risk teams, this changes the investment question. Before approving another platform or AI integration, they should establish whether it introduces dependencies that could interrupt essential work—and whether the organization can continue operating when those dependencies fail.

AT Worthy’s assessment of the available evidence is that a gap can emerge between the pace of digital expansion and the ability to validate, operate, and recover the systems supporting it. The recent incidents illustrate several mechanisms through which this happens. They do not establish that hardware is universally falling behind software, that outages are increasing across the economy, or that one technical cause connects the failures.

What the recent incidents actually establish

Three November incidents show why a single explanation is insufficient.

On November 13, the Federal Aviation Administration experienced network instability that prompted a nationwide ground stop. In its November 15 account, the FAA said excessive connection attempts destabilized legacy equipment. Its initial investigation identified two possible originating locations; work at one included deployment of a new router. Isolating the locations stabilized the network. The FAA said the root cause remained under investigation and distinguished the routine equipment work from its broader modernization program. This is preliminary evidence of a problem at the interface between equipment, network behavior, and an existing operating environment—not a completed diagnosis of a defective router or inadequate hardware capacity. FAA incident account.

Microsoft’s November 12–13 Exchange Online disruption presents a different mechanism. In a preliminary Microsoft service notice reproduced by the University of Pennsylvania, the company described traffic shifts during maintenance and upgrades exposing a latent software bug. Requests accumulated until affected servers exhausted available processing capacity and stopped accepting new connections. That account connects a software defect, network change, and capacity exhaustion. It does not establish that the servers were obsolete or that purchasing faster hardware would have prevented the incident. Microsoft service notices reproduced by Penn.

Apple attributed its November 17 disruption to an internal update, according to its statement reported by the Associated Press. Affected services included the App Store, Apple Music, and iCloud sign-in. That explanation identifies a trigger, but does not disclose enough engineering detail to establish why the update caused widespread interruption. AP report.

These accounts support investigation of change management and system interactions. They do not justify treating every outage as evidence of aging infrastructure. A trigger is the event preceding failure; a root-cause investigation must explain why safeguards failed to contain it.

Infrastructure age is a real exposure—with an important qualification

Evidence of aging-system risk exists independently of this month’s outages.

In December 2024, the U.S. Government Accountability Office reported that an FAA assessment had classified 51 of 138 air traffic control systems as unsustainable and another 54 as potentially unsustainable. These were historical assessment categories, not a November 2026 inventory. They nevertheless documented a substantial maintenance and modernization challenge before the latest disruption. GAO’s 2024 testimony.

Evidence figure

105 of 138 FAA systems faced sustainability concerns

U.S. air traffic control systems · FAA 2023 assessment, reported by GAO in December 2024 · number of systems

0204060Unsustainable51Potentially unsustainable54Remaining systems (derived)33

Modernization exposure was documented before the latest incident.

Selected: Unsustainable · 51

Source: GAO-25-107917

Historical inventory, not a November 2026 assessment. Remaining systems = 138 − 51 − 54; no additional category name is inferred. Counts do not establish the cause of the November outage.

View equivalent data table
105 of 138 FAA systems faced sustainability concerns
ClassificationSystems
Unsustainable51
Potentially unsustainable54
Remaining systems (derived)33

More recently, GAO’s September 2026 review of the FAA’s accelerated modernization effort identified missing planning foundations: a reliable lifecycle cost estimate and an integrated master schedule. GAO warned that these gaps increased the risks of further delays, cost overruns, and continued reliance on outdated systems. GAO’s September 2026 review.

The lesson for enterprise buyers is broader than replacing old equipment. A modernization plan must account for the period when old and new components coexist. That transition introduces compatibility questions, temporary dependencies, staff training needs, and rollback decisions. Funding the destination without funding the transition can leave an organization exposed during implementation.

Age should therefore prompt questions about supportability, spare parts, documentation, skills, and compatibility. It should not substitute for evidence about actual operating condition. An older, supported system with well-tested boundaries may be more dependable for a particular task than a newer platform whose failure behavior is poorly understood.

New infrastructure can fail through new software

The July 19, 2024 CrowdStrike incident provides a useful counterexample to the argument that obsolete hardware explains major disruption. CrowdStrike’s root-cause summary described a content configuration update that caused affected Windows systems to crash. Its account identified a mismatch between expected and supplied input fields that led to an invalid memory read. The published mechanism was a software failure, rather than a diagnosis of aging equipment. CrowdStrike root-cause summary.

The procurement implication is that buyers must consider how a supplier distributes changes, including changes outside a conventional application upgrade. A service can change through configuration, security content, routing rules, or an upstream dependency. Approval controls over the application alone may leave other consequential changes outside the buyer’s view.

This does not mean that frequent updates are inherently unsafe. Google’s Site Reliability Engineering guidance explains how small, automated releases and limited initial deployments can help reconcile delivery speed with reliability. A “canary” deployment exposes a small part of production to a change before expanding it. The guidance also recognizes that testing cannot reproduce every production condition. Google SRE guidance.

The relevant distinction is between speed supported by effective controls and speed that exceeds those controls. Slowing every release can delay security fixes and accumulate larger changes. Buyers should examine deployment safeguards and demonstrated recovery, rather than treating release frequency as a verdict.

Shared dependencies determine how far a failure travels

An application can run on modern hardware and still depend on a fragile shared service.

Cloudflare’s June 12, 2025 incident illustrates this mechanism. The company reported that a failure in storage infrastructure supporting Workers KV, partly backed by a third-party cloud provider, disrupted multiple products. Affected services included authentication-related capabilities and Workers AI. Other core services were not directly affected. The dependency structure explains why the impact crossed product boundaries without making the entire platform unavailable. Cloudflare incident report.

Evidence figure

Shared storage connected distinct service failures

Cloudflare · June 12, 2025 · selected documented dependencies; qualitative map

AccessWorkers AIWARPWorkers KV

Separate products can share a failure path.

Selected: Access · Workers KV · Policy and identity storage

Source: Cloudflare incident report

Selected direct dependencies reported by the provider; not the complete architecture. Arrows point from dependent to dependency. Node positions and sizes carry no numerical meaning.

View equivalent data table
Shared storage connected distinct service failures
Dependent serviceDepends onRole
AccessWorkers KVPolicy and identity storage
Workers AIWorkers KVRequest configuration and routing
WARPWorkers KVRegistration and authentication
WARPAccessAuthentication dependency

In an August follow-up, Cloudflare described a redesigned storage architecture and reported improvements during rollout. That disclosure is evidence of engineering work and the company’s reported results; it is not independent proof of future outage immunity. Cloudflare architecture follow-up.

For buyers, the practical question is whether apparently separate services share the same failure path. Two applications may depend on one identity provider. Two hosting regions may share a configuration system. A backup environment may require the same administrative credentials as production.

These are scenarios to investigate, not findings about every cloud architecture. Their significance is that redundancy must be evaluated against a specified failure. A second server can address a server failure while offering little protection against a faulty configuration distributed to both servers.

Purchasing from two suppliers can likewise reduce one exposure while preserving another if both rely on the same upstream provider. Supplier diversity and operational independence are related, but they are not interchangeable.

Where hardware and physical infrastructure genuinely constrain AI

There is a separate, well-supported case that physical infrastructure can limit digital expansion.

The International Energy Agency’s Electricity 2026 report describes a mismatch in construction timelines: planning, permitting, and completing new grid infrastructure can take five to fifteen years, compared with one to three years for data centres. These are broad ranges, not delivery schedules for individual projects. They show why buying compute equipment does not automatically secure the electricity infrastructure needed to operate it. IEA, Electricity 2026.

Evidence figure

Grid delivery can outlast data-centre construction

Global planning context · IEA Electricity 2026 · reported completion ranges, years

03691215YearsNew grid infrastructure5–15 yearsData centres1–3 years

Verify power readiness separately from the delivery of a building or compute equipment.

Selected: New grid infrastructure · 5 · 15

Source: IEA, Electricity 2026 — Grids

Broad ranges, not project forecasts or confidence intervals. Grid scope includes planning and permitting. Data-centre construction does not establish power availability. No midpoint or average is calculated.

View equivalent data table
Grid delivery can outlast data-centre construction
InfrastructureLower bound (years)Upper bound (years)
New grid infrastructure515
Data centres13

For an enterprise committing to AI capacity, this creates questions about when capacity will actually be available, where workloads can run, and whether a supplier’s expansion depends on unfinished infrastructure. Announced facilities, installed equipment, connected power, and production-ready services are different milestones.

This is a capacity-delivery exposure. It should be distinguished from an operational outage caused by a software defect. Both matter, but they require different evidence and responses.

AI can also increase operational exposure without exhausting hardware. Consider a proposed agent that checks inventory, requests approval, and creates a purchase order across several enterprise systems. This hypothetical workflow inherits the availability and permission requirements of each system. If an interrupted transaction is retried, the design must prevent duplicate orders and distinguish completed actions from pending ones.

The decision is therefore not simply whether the AI model is capable. It is whether the complete workflow remains correct, recoverable, and governable under partial failure. Nothing in the incidents examined here establishes that AI caused them.

Procurement should follow the business service

Traditional product comparisons can obscure this exposure when they emphasize features, price, and headline availability. Buyers need an additional view organized around the work that must continue.

For a payroll service, the outcome is employees receiving accurate payments on time. For a public benefits portal, it is an eligible person completing an application. For an AI-assisted procurement workflow, it may be an authorized order recorded once, with an auditable approval trail.

Start by identifying a small number of critical outcomes. Then trace the systems, external services, and human interventions required to deliver each one. The resulting investigation should distinguish four questions:

ExposureWhat procurement should establishEvidence to request
Capacity and supportabilityCan the service meet expected demand, and remain maintainable?Relevant load-test results, support commitments, capacity assumptions, and lifecycle plans
Change and compatibilityCan updates be introduced without unacceptable disruption?Staged deployment arrangements, compatibility testing, rollback conditions, and change-related incident history
Shared dependenciesCan one failure disable the primary service and its alternative?Dependency diagrams, failure-isolation explanations, and tests of independence
Recovery and continuityCan essential work resume within the organization’s tolerance?Exercise results, actual restoration experience, data reconciliation procedures, and usable fallback arrangements

These are suggested due-diligence questions, not a formal AT Worthy scoring system. Evidence should be proportionate to the importance of the service and the buyer’s ability to influence the supplier.

A smaller organization may not obtain a detailed infrastructure diagram from a major platform. It can still establish available export mechanisms, emergency contact arrangements, alternative communication channels, and which internal processes must pause when the platform is unavailable.

Measure usable recovery, not only technical restoration

A supplier declaring a service restored does not necessarily mean the customer’s operation has recovered.

Evidence figure

Cloudflare identified a shared cause 14 minutes after onset

June 12, 2025 · UTC · selected milestones; elapsed minutes from 17:52

0306090120150Minutes since 17:52 UTC17:52Incident starts18:06Shared KV cause identified18:21Priority raised to P020:23Recovery begins20:28Impact ends; SLOs restored

Recognizing a common dependency preceded restoration by more than two hours.

Selected: 17:52 · 0 · Incident starts

Source: Cloudflare incident timeline

Elapsed minutes are calculated from the published UTC timestamps. Selected events only; the 156-minute span is not a measurement of customer operational recovery. SLO means service-level objective.

View equivalent data table
Cloudflare identified a shared cause 14 minutes after onset
Time (UTC)Elapsed minutesMilestone
17:520Incident starts
18:0614Shared KV cause identified
18:2129Priority raised to P0
20:23151Recovery begins
20:28156Impact ends; SLOs restored

Consider a hypothetical payment interruption. Network access returns, but the organization must still determine which transactions completed, reconcile pending instructions, and prevent duplicate submissions. A recovery measurement that stops when the application responds misses this remaining work.

Procurement and risk teams should distinguish the supplier’s restoration target, its performance in actual incidents, and the customer’s time to resume dependable operations. A recovery target is a planning commitment. An exercise provides evidence under specified conditions. An incident shows performance under one real set of circumstances. None alone establishes performance in every future failure.

Commercial terms should reflect that distinction. An availability commitment may address a narrowly defined component while the buyer depends on a longer workflow. A financial credit does not complete interrupted work. Buyers should examine measurement scope, exclusions, notification provisions, and the operational assistance available during recovery.

Fallback arrangements also deserve realistic testing. A manual process may serve a handful of transactions but fail at peak demand. An alternative channel may be inaccessible to some users. A system that preserves safety by stopping an operation should be assessed differently from one that continues operating with uncertain results.

What public evidence can—and cannot—tell a buyer

Public incident reports can reveal affected services, acknowledged dependencies, recovery sequences, and proposed corrective actions. Repeated disclosures can help identify questions for renewal negotiations or deeper technical review.

Their limitations are equally consequential. Providers differ in what they publish, how they define incidents, and how long they retain records. A vendor with detailed disclosures may appear worse than a less transparent competitor. Counting public outages without accounting for those differences can reward opacity.

AT Worthy’s Data-to-Rating methodology provides a relevant discipline: keep observations separate from evaluative judgments, preserve evidence lineage, and make uncertainty explicit. This article does not apply a formal D2R assessment, assign ratings, or establish comparative vendor performance.

The distinction matters commercially. A documented dependency is an observable fact. A conclusion that it creates unacceptable exposure requires information about architecture, safeguards, workload, and the buyer’s tolerance. Where public evidence ends, the next step may be a targeted supplier question or commissioned technical investigation.

The closest assessment area is AI and Digital Worthiness, which assesses whether an entity provides a user experience worthy of trust, confidence, and praise through the effective use of digital and AI capabilities. Continuity, accessible alternatives, and accurate recovery communications are relevant to that experience. They do not, by themselves, establish an overall worthiness verdict.

What leaders should monitor next

For critical suppliers, monitoring should follow unresolved questions rather than simply collect outage headlines.

Track whether preliminary explanations become final technical reports; whether promised safeguards are implemented; whether similar failure mechanisms recur; and whether recovery tests include shared dependencies. For planned AI capacity, distinguish expansion announcements from operational readiness.

Internally, review whether the number of automated workflows is growing faster than the organization’s ability to identify their dependencies and recover interrupted transactions. Watch for emergency changes, repeated rollback difficulties, unsupported components, and continuity plans that have not been exercised at realistic volume.

A useful next step is to select one essential workflow before the next procurement approval or renewal. Identify what stops it, what remains available, who can authorize an alternative, and what evidence shows that the alternative works.

The investment priority should follow the weakness that this investigation finds. Some organizations will need replacement hardware. Others will need better isolation, deployment controls, capacity management, or recovery procedures. The defensible objective is to ensure that digital capability expands alongside the ability to sustain the outcomes users depend on.

Sources

Blog

Read More Posts

Independent analysis and ratings assessing trust, performance, and governance in digital and AI systems.

Introducing the Data-to-Rating Framework
date icon

Tuesday, Jun 23, 2026

Introducing the Data-to-Rating Framework

A methodology for turning public digital evidence into structured judgment AT Worthy is publishing the Data-to-Rating...

Read More
National Capital Region (NCR) Edition of the US AI Worthiness Report 2026
date icon

Friday, Apr 03, 2026

National Capital Region (NCR) Edition of the US AI Worthiness Report 2026

This edition examines the District of Columbia, Maryland, and Virginia as an integrated federal state corridor where AI...

Read More
Launching the Global AI Worthiness Index 2025
date icon

Monday, Dec 22, 2025

Launching the Global AI Worthiness Index 2025

AT Worthy is pleased to announce the publication of the Global AI Worthiness Index 2025, or GAWI 2025. This inaugural...

Read More

Discuss Your Requirements

AT Worthy works with organizations on research, evaluation, governance, and technology intelligence projects tailored to their objectives.

Contact Us
Unicode Gold Sponsor badge

AT Worthy is a sponsor of the UNICODE as a Lifelong and Unique Gold Adopter of the character « @ » the Digital Rating's symbol.

GliaNet Alliance founding member logo

AT Worthy proudly stands as a founding member of the GliaNet Alliance, joining a coalition committed to ethical technology and digital trust.